Stainless Steel High Pressure 3000 PSI CV 1 Pressure Reducing Regulator Valve
Features:
Cartridge valve design incorporates a 10 micron filter that protects the regulator seat and makes service simple
Optional neoprene diaphragm provides exceptional sensitivity for precise pressure control
Gauges, relief and shut-off valves, and cylinder connections are available
Operating Parameters:
Maximum Inlet Pressure
3000 psig (206 bar)
Outlet Pressure Ranges
0-25 psig (0-1.7 bar),0-50 psig (0-3.4 bar) , 0-100 psig (0-6.8 bar), 0-125 psig (0-8.6 bar), 0-200 psig (0-13.7 bar)
Design Proof Pressure
150% maximum rated
Leakage
Internal: bubble-tight
External: design to meet ≤ 2 x 10-8 mbar l/sec He
Operating Temperature
PCTFE seat: -40 °F to 140 °F (-40 °C to 60 °C)
PEEK: -40°F to 392°F (-40°C to 200°C)
PI seat: -40 °F to 250 °F (-40 °C to 121 °C)
Flow Capacity
Cv = 1.0




Company Introduce:
Introduction of Hikelok® Brand
1.Established time: in 2011
2.Experience/Advantage:focused on precision fluid fittings and valves for more than 10 years.We enjoy a good reputation in the foreign business .
3.Product's style is similar to well-known brand Swagelok ®and Parker ®.
4.Products introduction:the main products of hikelok include ball valves,needle valves,instrument manifolds,bellows valves,
check valves,twin ferrules series tube fittings,instrument pipe fittings,weld fittings and other kinds of instrumentation valves and fittings.
5.Body materials: stainless steel,alloy steel, brass,special alloy and carbon steel
6.Standard products:ANSI,ASME,ASTM,API,MSS,ISO,EN,GB,JB,HG ect.
7.Application:widely used in power generation,petroleum,petrochemical,natural gas, semiconductor,laboratory,shipbuilding, steel,chemical industry and other fields
8.Certificate:ISO9001 ,2015;ISO14001;ISO45001;ABS;CE
Certifications:
ISO9001 ,2015;ISO14001;ISO45001;ABS;CE
Our Services
From quote to delivery, we can provide the detailed support you need:
1. CAD drawing
2. P&ID
3. Component selection
4. Bill of material
5. Professional services such as bending and welding
6. Testing to guarantee the system
7. Professional packaging and delivery
8. Give you solution within 24 hours