Stainless Steel High Purity VCR Connection Pressure Reducing Regulator
Features:
Optimum performance and cleanliness at a great value
Internal surface finished to 10 Ra microinch /0.25 micrometer ensures minimal particle generation or entrapment
True metal-to-metal body diaphragm seal provides enhanced leak integrity
No bias spring or friction device in the flow stream
Adjustable stop to limit outlet pressure
Positionable ported bonnet ring is available
Operating Parameters:
Maximum Inlet Pressure
3500 psig (241 bar)
600 psig (41.4 bar)
250 psig (17.2 bar)
Outlet Pressure Ranges
0-30 psig (0-2.1 bar), 0-60 psig (0-4.1 bar), 0-100 psig (0-6.9bar), 0-150 psig (0-10.3 bar), 0-250 psig (0-17.2 bar)
Design Proof Pressure
150% maximum rated
Leakage
Internal: Bubble-tight
External: Design to meet ≤ 2 x 10 -9 atm cc/sec He
Operating Temperature
PCTFE Seat:-40°F to 140°F (-40°C to 60°C)
PTFE Seat:-40°F to 160°F (-40°C to 71°C)
PI Seat:-40°F to 350°F (-40°C to 177°C)
Flow Capacity
Cv = 0.06
Company Introduce:
Introduction of Hikelok® Brand
1.Established time: in 2011
2.Experience/Advantage:focused on precision fluid fittings and valves for more than 10 years.We enjoy a good reputation in the foreign business .
3.Product's style is similar to well-known brand Swagelok ®and Parker ®.
4.Products introduction:the main products of hikelok include ball valves,needle valves,instrument manifolds,bellows valves,
check valves,twin ferrules series tube fittings,instrument pipe fittings,weld fittings and other kinds of instrumentation valves and fittings.
5.Body materials: stainless steel,alloy steel, brass,special alloy and carbon steel
6.Standard products:ANSI,ASME,ASTM,API,MSS,ISO,EN,GB,JB,HG ect.
7.Application:widely used in power generation,petroleum,petrochemical,natural gas, semiconductor,laboratory,shipbuilding, steel,chemical industry and other fields
8.Certificate:ISO9001 ,2015;ISO14001;ISO45001;ABS;CE
Certifications:
ISO9001 ,2015;ISO14001;ISO45001;ABS;CE
Our Services
From quote to delivery, we can provide the detailed support you need:
1. CAD drawing
2. P&ID
3. Component selection
4. Bill of material
5. Professional services such as bending and welding
6. Testing to guarantee the system
7. Professional packaging and delivery
8. Give you solution within 24 hours